DPOC—DAR PETROLEUM OPERATING COMPANY

  • DPOC has been operating in block 3E&7E since 2001
  • Blocks 3E & 7E have an area of 50,442 sq.km
  • DPOC’s existing stake holders are:
    1. China National Petroleum Corporation (CNPC) – 41%
    2. PETRONAS – 40%
    3. Nile Petroleum Corporation (NILEPET) – 8%
    4. SINOPEC – 6%
    5. TRI-OCEAN 5%
  • First oil production was in 2001 and average current production is about 125 Kstb/d
Blocks Oil Fields Number Of Wells Capacity Location
3 and 7 Moleeta 88 in Moleeta Paloch Upper Nile State
Paloch 318 in Paloch
Adar 43 in Adar
Gassab 76 In Gassab
Gumry 76 in Gumry

Central Processing Facility (CPF)

  • 1 CPF in Al Jabalyn

Field Processing Facility-Palouch (FPF)

  • 1 FPF in Moleeta
  • 1 FPF in Paloch
  • 1 FPF in Gumry
  • 1 FPF in Adar
https://nilepet.com/wp-content/uploads/2020/04/nilepet-logo-white-320x80.png
OFFICE HOURS

Our support Hotline is available 8 Hours a day

Monday-Friday: 8 AM to 5 PM
Saturday – Sunday: By Special Appointment
Public Holidays: Closed

en_USEnglish