- DPOC has been operating in block 3E&7E since 2001
- Blocks 3E & 7E have an area of 50,442 sq.km
- DPOC’s existing stake holders are:
- China National Petroleum Corporation (CNPC) – 41%
- PETRONAS – 40%
- Nile Petroleum Corporation (NILEPET) – 8%
- SINOPEC – 6%
- TRI-OCEAN 5%
- First oil production was in 2001 and average current production is about 125 Kstb/d
Blocks | Oil Fields | Number Of Wells | Capacity | Location |
---|---|---|---|---|
3 and 7 | Moleeta | 88 in Moleeta | Paloch Upper Nile State | |
Paloch | 318 in Paloch | |||
Adar | 43 in Adar | |||
Gassab | 76 In Gassab | |||
Gumry | 76 in Gumry |
Central Processing Facility (CPF)
- 1 CPF in Al Jabalyn
Field Processing Facility-Palouch (FPF)
- 1 FPF in Moleeta
- 1 FPF in Paloch
- 1 FPF in Gumry
- 1 FPF in Adar